The challenge
Managing restaurant construction across a multi-billion dollar enterprise is hard enough. Doing it on fragile, shared spreadsheets made it harder.
The brand started moving to Power Apps. As the portfolio grew, testing stayed informal, which led to high defect rates and problems after release.
We replaced fragile spreadsheets with a central suite of Power Apps and set up quality engineering standards that took post-release fixes from 70% of deployments to zero.
Engineer Up brought a team of architects, Power Apps developers, and quality engineering leads to build the software and a quality culture around it.
The solution: build and test together
We took on software development and quality testing at the same time.
Built a central planning suite
We built Canvas and model-driven Power Apps on Dataverse, giving restaurant development one source of truth nationwide.
Created a quality practice from scratch
We put formal testing standards, automated test scripts, and feedback loops in place across apps, flows, data models, and external APIs.
Standardized every release
We introduced a required pre-deployment checklist and regular one-on-one feedback sessions with users.
Post-release defects, eliminated
Before the release checklist, about 70% of deployments needed fixes or follow-up afterward. After it, every required validation was completed before launch.
- Production defects dropped significantly
- Sprint velocity increased
- Business owners trust every update that ships